Mercia Park, Swadlincote

Central Contractors Ltd was contracted by Winvic Construction Ltd to decorate and finish 9 industrial and warehouse buildings at Mercia Park, Swadlincote Derbyshire. The project consisted of a total of 6 units with two being further fitted out into logistics facilities a total of 25,000 m2 walls and ceilings. There was also 3 other DSV buildings with a total of over 10,000 m2 of painting to walls and ceilings.

Our scope of works involved:

  • Painting and Decorating
  • Total of 9 buildings
  • 2 fitted out into logistics facilities
  • Over 35,000 m2 of walls and ceilings
  • Average onsite labour force of 6 men
  • Project duration – 16 months
Industrial Building Icon | Central Contractors Ltd

Industrial
Buildings

9

Surface Area m2 Icon | Central Contractors Ltd

Surface
Area m2

35,000

Project Duration Icon | Central Contractors Ltd

Project
Duration

16

Labour Workforce Icon | Central Contractors Ltd

Labour
Force

6